IN CHARGE SERIES Communications READY bags

Control Box.


Included is RKA’s ingenious Control Box.
This box actually designed into the bag and coordinates with the Portals on the left side of the bag.
Ready for you to start installing tour cables.

Control box closed
Control box opened showing the included SAE to SAE power cord entering the bag
Control box is out of the bag in this photo so we can show you the inside of the portal design. The cords come in or out of the bag via the portals on the left side of the bag, then into the control box via the opening in the center of the photo and into the control box..